Links to official Wanner YouTube videos
Wanner™ has created over 2 dozen YouTube videos which we have categorized below for ease of access and viewing.
Installation: Recommended pump system characteristics (2 min)
Demonstrations
Demonstration of operating pump dry (30 seconds) (Hydra-Cell® pumps are not damaged by running dry)
Demonstration of cavitation (45 seconds) (Hydra-Cell pumps are unharmed by cavitation)
Demonstration of Hydra-Cell design (1 min) with cut-away pump
Demonstration of Hydra-Cell metering pump design compared to other designs (2 min)
Animated Demonstration of the T100/200 pump design (1 min) Redone with oilfield installation examples (2 min)
Pump Repair
T100 & Q155 Liquid End Service (28 min)
T100 bias rod retrofit (7 min)
T100 power end inspection (30 min)
9 part series using model H25 as an example (also applicable to D10, D12, & D40 pumps)
Chapter 1: Overview of Hydra-Cell pump and nomenclature (3 min)
Chapter 2: Fluid end service: Remove pump manifold, valve plate and check valves (9 min)
Chapter 3: Fluid end service: How to analyze and replace diaphragms (6 min)
Chapter 4: Fluid end service: Priming the hydraulic cells (5 min)
Chapter 5: Fluid end service: Reinstall valve plate and manifold (3 min)
Chapter 6: Hydraulic end service: remove camshaft assembly and inspect (7 min)
Chapter 7: Hydraulic end service: reassemble and install Hydra-Cell pistons (2 min)
Chapter 8: Hydraulic end service: reassemble cam assembly and Cylinder (9 min)
Chapter 9: Troubleshooting Hydra-Cell pumps (5 min)
Pulseless Metering Pump Model MT8
MT8 fluid end priming (6 min)
MT8 hydraulic end priming (11 min)
MT8 diaphragm replacement (11 min)
MT8 check valve replacement (11 min)